2016

HÔTEL PLACE DAUPHINE

Place Dauphine, Paris 1er

    indexed

    Historic Monuments in Supplementary Inventory

    client

    SARL Henri IV- Dauphine, Paris; ICADE

    project management

    GMDP Architecture

    surface

    500 m²

    cost of the works

    € 2 M excl. VAT

    Designed under Henri the Fourth, this royal square has kept its historical composition and features with a narrow lot matching the original dwelling and a brick and stone architecture with two floors and an attic above the stores and their basement.
    The agenda is based on the hotel’s full rehabilitation and restructuring in order to create a hotel complex of 7 luxurious apartments featuring 3 duplex ones.
    The restructuring of the building is lead keeping as much of the original material as possible while adapting the planning to safety standards, energetic control and desired comfort.
    An elevator designed not to go through the historical vaults was installed.
    Subcontract works and indoor planning also aim at displaying as much of the historical layers as possible for international customers.
    The building’s rigorous restoration was also started in order to read its historical evolution on the facade.